![]() South East Porcupine Basin, 150 kms southwest of Ireland.Īpproximately 35 days (weather dependent) M/V “THOR CHASER” – call sign: J8B2384 – chase/guard vessel M/V “THOR MAGNI” – call sign: C6BH9 – supply/standby vessel R/V “RAMFORM VANGUARD” – call sign: C6TU8 (Seismic survey vessel) 07 of 2017, click on the link: MN 07 of 2017 Druid Drombeg The vessel will be listening on VHF Channel 16 at all times.įull details: For full details, including map, of the Marine Notice No. Vessel Name/Call Sign: The Fugro Searcher (call sign: 3EUY6). The latest completion date for the survey is 19th March 2017. Start Date and duration: 19th February 2017 and the estimated duration is 6 days, weather permitting. The survey will also include shallow geotechnical sampling and an Environmental Baseline Survey. Location: Block 53/6, Southern Porcupine Basin, approximately 220 km off the southwest coast of Ireland.Īctivity: Multi-beam echosounder, dual frequency sidescan sonar and sub-bottom profiler assisted by the use of an Autonomous Underwater Vehicle (AUV) operated in close proximity to the vessel. Operator: Orbis Energy Ltd on behalf of Providence Resources PLC. The seismic vessel and equipment will traverse along pre-determined lines across the operations area at a speed of approximately 4.5kts.īlock 53/6, Porcupine Basin, Druid-Drombeg site survey There will be a surface tailbuoy, including a flashing light and active radar transponder, at the end of both of the outer streamers. The vessel will tow 14 x 8000m long solid streamers, with a separation of 100m and at depth of 12m below the surface of the water. The vessel will tow 12 x 8000m long solid streamers, with a separation of 100m and at depth of 12m below the surface of the water. Geo Caspian / 3FCZ6 (Seismic survey vessel)Īpproximately 100 days (dependent on weather) The seismic vessel and equipment will traverse along pre-determined lines across the operations area at a speed of approximately 4.5 knots. The vessel will tow 12 x 8100m long solid streamers, with a separation of 100m and at depth of 18m below the surface of the water. Shearwater Geoservices – Seismic survey vesselĪpproximately 140 days max. MV Andrea (or similar) – details to be confirmed (Support vessel) MV Polar Marquis / LAO15 (Seismic survey vessel) The proposed survey will also include high-resolution 2D seismic acquisition to accurately determine potential future drilling hazards over the Newgrange location.īetween the Southern Porcupine and Goban Spur basins (see map attached) ![]() Seabed (benthic) samples will also be taken using a box corer or grab, as appropriate, and geotechnical sampling will be undertaken with a piston corer to a minimum target depth of 6m below the seabed. The site survey will be undertaken using dual frequency side scan sonar, single-beam and multi-beam echosounders, side scan sonar, sub-bottom profiles and magnetometer. ‘Newgrange’ Porcupine-Goban Spur Site Survey 2018 ![]() Standard Exploration License 1/11 (SEL1/11)Ī site survey comprising a seabed and shallow geophysical survey and an environmental baseline and habitat survey will be undertaken over three survey areas comprising four potential well locations within two separate survey vessel activity areas at the Barryroe location ( see attached map for location) together with a single environmental control point approximately 10 kilometres to the east southeast.Īpproximately sixteen (16) days (dependent on weather) Petroleum Prospecting License 3/16 (PPL 1/19) ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |